A wide range of technical capabilities enable us to undertake all aspects of train refurbishment. The scope of works might include system modernization, design upgrades, component refurbish or replacement, analysis, and test and commissioning.
Bogie refurbishment includes structural analysis of the frames, motor, drive gear and suspension, and refurbishment or replacement as per clients requirement. Post works, all refurbished or rebuild bogies are subjected to static and dynamic testing before being delivered to clients.
Modern rail vehicles has progressively increased in size and lenght, challenging designers to provide innovative solutions. We offer refurbished or replacment Gangways compliant to international standards.
Door systems refurbishment can be performed within short time periods and include component and electronics upgrades and post works compliance testing. Our expertise covers both Pneumatic or Electric driven doors and include modernizations, safety systems upgrades or redesign
As part of brake systems overhaul, we offer compressor, dryer and control valve overhauls or replacement programs compliant to international standards, These include Static and Dynamic test protocols as standard operating procedures
Train or Mid-life refurbishment includes Traction systems, HVAC, Comunication, Public Address, CCTV, Vehicle Control, Passenger Information Displays and Annunciation systems refurbishment. These can be replacement, repair or upgrades
Copyright © 2020 - Rolling Stock Consultants Sdn Bhd
Lot 7815, Jalan Bukit Cherakah, Monterez U9. 40150. Shah Alam. Selangor Tel: +603-78323222 ; +603-77284484; +603-78324122; +603-78324922; Fax: +603-78323422.
Since 2004